High Flying Terminator

Published on: 5th June 2019

On a balmy summer evening back in June, the team at Steve Marsh Design arrived at the Port of Dover in full Health & Safety orange gear, ready to undertake work on the overhead gantry signs.

Due to the volume of traffic at the Port, the work was carried out in the evening under cover of darkness (although how can you miss that orange gear)!

We had been asked to replace the text on the gantry signs, due to their location this required the use of a scissor lift platform.

As the photo shows, this was fronted by our very own General Manager Mark Griffiths, masquerading as Arnie’s understudy.

Despite the terrified look, the work went to plan and was completed in record time.

Well done team!

View other installations by us…

< Back to blog listing

Request a callback...

For more information contact us here